Nikkiso selected to provide regasification systems and engineering services for LNG-to-power project in Bahamas

The project involves an LNG receiving terminal in support of additional power generation at Clifton Pier. It aims to deliver lower-carbon infrastructure by using LNG to feed new and retrofitted gas turbines which previously used diesel. Nikkiso CE&IG will manufacture and deliver the LNG packaged regasification system which includes high-pressure submerged centrifugal pumps installed in a modular pump skid; a gas-fired water bath vaporizer and associated power distribution and control systems; an insulated pipeline featuring Nikkiso CE&IG’s vacuum jacketed system; and site critical ancillary equipment. The Group will also provide engineering services in support of the project.

The packaged regasification system, with capacity of 55 million standard cubic feet per day, features a modular, standardized design which will reduce system integration time and cost.

Learn more about bunkering system ⭢
Back to List

Related Products