Engineered to manage boil-off gas reliably
Nikkiso’s LINEX-BOG subcooling and reliquefaction system provides tank pressure management by subcooling LNG or by reliquefying excess boil-off gas.
The system utilizes robust, industry standard components that can be customized to a client’s specific ship requirements. Our typical size packages range from 250 kg/h to 3,300 kg/h.
Our skids are built in our wholly owned marine certified fabrication centers including centers and meet all major maritime class society requirements.

1. Unique compact system suited to fit any LNG carrier or other marine vessels
2. Designed to manage 12 to 90mTPD of BOG or higher
3. Design utilizes Nikkiso’s own high efficiency turboexpander and compressor technology
4. Automatic load & unload included in controls to maintain tank pressure
5. Local & remote push button start/stop
6. Robust industry standard machinery